daily check
(日常点検)
daily maintenance
(日常保全)
data processing section
(情報システム課)
date
(日付)
date change entered
(設変入力日)
date last issue
(最新出庫日)
date last receipt
(最新受入日)
dating the last operation day
(前回オペレーション日付設定)
de-nominator variance
(操業度差損:de-nominator variance)
dead heading
(空輸送)
debit
(借方 )
debtor
(借方)
decentralized order
(分散発注)
declining balance method
(定率法)
decreasing of work time
(工数低減)
defect
(不良)
defects
(不良のムダ)
Production of defective parts or correction. Repair or rework, scrap, replacement production, and inspection mean wasteful handling, time , and effort.
→不良のムダ
defect by machined
(加工不良)
defect measures
(不具合対策)
defectives
(不良数)
deferred charges
(繰延資産)
degradation
(劣化)
degradation loss
(劣化損失)
delay
(遅れ)
delayed the date of delivery
(納期遅延)
dele
(削除)
delete
(削除)
delete i/r record -mths
(検収履歴削除(月数))
delete payrecord -ms
(支払履歴削除(月数))
delete vendor record -ms
(仕入先元帳履歴削除(月数))
deletion
(削除)
delivery control
(納期管理)
demand forecast
(需要予測)
demonstrated capacity
(計画能力)
department (section) cost
(部門費)
dependent demand
(従属需要)
Demand that is directly related to or derived from the bill of material structure for other items or end products. Such demands are therefore calculated and need not and should not be forecast. A given inventory item may have both dependent and independent demand at any given time. For example, a part may simultaneously be the component of an assembly and also sold as a service part.
→じゅうぞくじゅよう
dependent demand item
(従属需要品目)
depreciable limit
(償却可能限度額)
depreciation
(償却、減価償却)
depreciation cost
(減価償却費)
depreciation expense
(減価償却費)
depreciation of jig/die on loan
(貸与治具型償却費)
depreciation rate
(償却率)
depreciation ratio against sales amount
(売上高償却費率)
description
(品名)
design change for current products
(量産維持業務)
design fee for mass production
(量産維持設計費)
design to order one of a kind production
(個別生産)
design-in
(デザインイン)
destination
(仕向地)
detail
(明細・細品番)
details
(参照明細)
development class code(sales available priority)
(開発区分コード)
development cost
(開発費)
development date
(開発日)
開発時期
development department
(開発部門)
development lead time
(開発リードタイム)
device
(装置)
differential cost and revenue analysis
(差額原価収益分析)
digit
(桁)
direct charge
(直課)
direct costing
(直接原価方式、直接原価計算)
direct costs
(直接費)
direct delivery system
(直納方式)
direct expense
(直接経費)
直接費
direct freight on sales
(販売直接運送費)
direct freight-out
(販直運送費)
direct labor cost
(直接加工費(直接製造部門))
直接工労務費、直接労務費
direct labor hours
(直接作業時間)
direct manufacturing cost
(製造直接費)
direct material cost
(直接材料費)
direct materials cost
(直接材料費)
direct parent item no.
(直接親品番)
direct payroll
(直接工人件費)
direct sales cost
(販売直接費)
direct selling cost
(販売直接費)
direct time
(直接時間)
direct tracing
(直課(直接課する))
direct worker
(直接工)
direct worker's overtime work hours
(操業度)
discard all unnecessary items
(整理(Seiri) )
Discrete Manufacturing
(個別生産)
Discrete Manufacturing is a Batch production situation related to most industries like Engineering (for example, you have discrete number of automobiles made, or even number of batches of a pharmaceutical formulation).
→こべつせいさん
dispatching
(差し立て)
The selecting and sequencing of available jobs to be run at individual workstations and the assignment of those jobs to workers.
→さしたて
dispatching rule
(差し立てルール)
The logic used to assign priorities to jobs at a work center.
→さしたてルール
distribution
(流通・分布)
The activities associated with the movement of material, usually finished products or service parts, from the manufacturer to the customer. These activities encompass the functions of transportation, warehousing, inventory control, material handling, order administration, site/location analysis, industrial packaging, data processing, and the communications network necessary for effective management. It includes all activities related to physical distribution , as well as the return of goods to the manufacturer. In many cases, this movement is made through one or more levels of field warehouses. Syn: physical distribution.
→りゅうつう
distribution control section
(工務課)
distribution of machine/parts/materials
(物流)
ditto / do.
(同上・同前)
diversify few quantity production
(多品種少量生産)
divisional performance
(事業部業績)
do you replace data?
(置き換えしますか?:do you replace data?)
document of process specification
(作業標準書)
domestic
(国内向の)
double bin system
(ダブルビン方式)
double-entry bookkeeping
(複式簿記)
downstream control
(川下管理)
downward milling
(下向き削り)
Dr.
(借方)
drastic measures
(抜本対策)
drawing issue
(原図登録)
drawing management system
(図面管理システム)
drawing number
(図番)
drawing release mark
(出図マーク)
drawing size
(図面サイズ)
drawings
(図面)
drawings for casting
(鋳造図)
drawings for forging
(鍛造図)
drawings of jigs/tools
(治具/工具図面)
drawings of raw materials
(素材図)
drawings of shape-cut plate
(切り板図)
drifting management
(成り行き管理)
DRP
(物流資源計画:Distribution resource planning)
The extension of distribution requirements planning into the planning of key resources contained in a distribution system: warehouse space, work force, money, trucks, freight cars, etc.
→ぶつりゅうしげんけいかく
Drum-buffer-rope
(ドラムバッファーロープ:Drum-buffer-rope)
The generalized technique used to manage resources to maximize throughput. The drum is the rate or pace of production set by the system's constraint. The buffers establish the protection against uncertainty so that the system can maximize throughput. The rope is a communication process from the constraint to the gating operation that checks or limits material released into the system to support the constraint.
→ドラムバッファーロープ
due date
(納期)
必要な時
during the process
(処理中)
duty
(関税)
Wordsworth - Version2.6.0 (C)1999-2002 濱地 弘樹(HAMACHI Hiroki)