fabrication
(組立)
facilities
(設備)
facilities maintenance section
(設備保全部門)
facility expense
(設備関連費)
facility trouble
(設備故障)
factory
(工場)
工場調達
factory overhead
(製造間接費)
failed acquiring error message
(エラーメッセージを取得出来ませんでした。)
failed dataupdating!
(更新出来ませんでした!!)
failsafe techniques
(フェール・セーフ技術:failsafe techniques)
→ぽかよけ
failsafe work methods
(フェール・セーフ仕事方法:failsafe work methods)
→ぽかよけ
failure
(故障)
failure physics
(故障物理)
fastest
(最早終了日)
fatigue
(疲労)
FIFO
(先入先出法)
file
(ファイル)
financial accounting
(財務会計)
financial statements
(財務諸表)
finish
(終了)
finish-to-order
(受注組立生産)
finished product
(完成品)
fire-fighting
(もぐらたたき)
firm
(確定)
first in first out
(先入れ先出し)
fiscal year
(会計年度)
fit
(はめあい)
fit symbol
(はめあい記号)
fit tolerance
(はめあい公差)
fitting-out
(整備)
fitting-out before shipment
(出荷整備)
five S's
(5S)
five W's one H
(5W1H)
fixed
(本JOB)
fixed asset tax
(固定資産税)
fixed assets
(固定資産)
fixed cost
(固定費)
fixed costs
(固定費)
fixed electricity cost
(固定電力料)
fixed materials cost
(固定材料費)
fixed order quantity system
(定量発注方式)
fixed percentage on declining balance method
(定率法)
fixed powers cost
(固定電力料)
flexible manufacturing cell
(FMC)
flexible manufacturing system
(FMS)
flow
(順番)
flow control
(流動数管理)
A specific production control system that is based primarily on setting production rates and feeding work into production to meet these planned rates, then monitoring and controlling production.
→りゅうどうすうかんり
flow process analysis
(製品工程分析)
fn
(ファンクションコード)
fnsh day
(終了日)
FOB price
(FOB総原価)
follow-up control
(進捗管理)
following data not registered in authority adm table!
(権限管理テーブルに以下のデータ登録されていませんでした!!)
following pro id does not exist
(指定されたプログラムidは存在しません。)
following process
(次工程)
forecast
(予測)
foreign currency transaction
(外貨建取引)
forging
(鍛造素材)
former model
(旧形)
forms
(帳票)
formula
(処方,調理法:formula)
→ぶひんひょう、
BOM
forward scheduling
(前進スケジューリング)
A scheduling technique where the scheduler proceeds from a known start date and computes the completion date for an order, usually proceeding from the first operation to the last. Dates generated by this technique are generally the earliest start dates (ESD) for operations.
→ぜんしんスケジューリング、backward scheduling
foundry department
(鋳造部)
frequency distribution
(度数分布)
fringe benefit
(福利厚生費)
full cost
(総原価)
full costing
(全部原価方式、全部原価計算)
function
(機能)
function design
(機能設計)
function names
(機能名称)
fyi (for your information)
(お知らせ)